What does ERTMS stand for?
Which organization is the Design Authority of ERTMS?
Where is the EVC (European Vital Computer) installed?
What is the primary goal of ERTMS?
What is the primary purpose of the Eurobalise in ERTMS?
The National ATP systems are known as STM (Specific Transition Module). How many different STM are there in Europe?
Which country was the first to implement ERTMS nationwide?
Which companies are full members of UNISIG?
What are the main components of ERTMS framework when designed for level 2 use?
What is the main difference between ERTMS Level 1 and ERTMS Level 2?
In Level 2 of ERTMS, how are trains continuously updated with information?
Which country has the longest ERTMS-equipped high speed rail network in Europe?
Which ERTMS packet gives a connection order to a given RBC?
In ERTMS Level 2, what is the purpose of the Movement Authority (MA)?
Which frequency band does GSM-R use for communication between trains and the control center?
Which technology is set to replace GSM-R as means of continuous communication?
Which of the following is not an Interoperability Constituent of ERTMS?
What will be the main characteristic of ERTMS's level 3, according to TSI (Technical Specification for Interoperability) 2023?
Which ERTMS message provides position and status information from the train to the trackside RBC?